Log in

ARIZONA TRAVEL

ADOT selects builders, operators for 18 electric vehicle charging stations

Posted 9/2/24

PHOENIX – The Arizona Department of Transportation has announced the first set of awards to design, build, operate and maintain a network of privately owned electric vehicle charging stations …

You must be a member to read this story.

Join our family of readers for as little as $5 per month and support local, unbiased journalism.


Already have an account? Log in to continue.

Current print subscribers can create a free account by clicking here

Otherwise, follow the link below to join.

To Our Valued Readers –

Visitors to our website will be limited to five stories per month unless they opt to subscribe. The five stories do not include our exclusive content written by our journalists.

For $6.99, less than 20 cents a day, digital subscribers will receive unlimited access to YourValley.net, including exclusive content from our newsroom and access to our Daily Independent e-edition.

Our commitment to balanced, fair reporting and local coverage provides insight and perspective not found anywhere else.

Your financial commitment will help to preserve the kind of honest journalism produced by our reporters and editors. We trust you agree that independent journalism is an essential component of our democracy. Please click here to subscribe.

Sincerely,
Charlene Bisson, Publisher, Independent Newsmedia

Please log in to continue

Log in
I am anchor
ARIZONA TRAVEL

ADOT selects builders, operators for 18 electric vehicle charging stations

Posted

PHOENIX – The Arizona Department of Transportation has announced the first set of awards to design, build, operate and maintain a network of privately owned electric vehicle charging stations along interstate highways.

Forty-nine proposals were received for 18 fast-charging stations that will fill in gaps in the charging network along I-10, I-8, I-40, I-17 and I-19, ADOT officials stated in a release. 

The stations are intended to reduce “range anxiety” and encourage use of electric vehicles as a viable alternative to gasoline-powered vehicles.

Construction is expected to take a year to complete after final contracts have been signed, with some stations opening by late 2025, according to state transportation officials.

The stations will mostly be located at existing gas stations and travel centers, with several others either at restaurants or hotels. The stations will be equipped with CCS plugs. 

The charging stations are funded through the National Electric Vehicle Infrastructure program, which is allocating $5 billion in funds nationwide through the U.S. Departments of Transportation and Energy, including $76.5 million for Arizona.

“As more Arizona drivers and visitors to our state get behind the wheel in electric vehicles, ADOT is helping develop a network of reliable and convenient charging stations that the public can count on,” ADOT Director Jennifer Toth said. “This is an important step in supporting electric vehicle drivers by reducing range anxiety.”

The charging stations generally will be spaced no more than 50 miles apart and must be built within a mile of a freeway interchange. Each station will include at least four NEVI-compliant chargers, with some featuring as many as seven. The chargers are intended to charge a typical electric vehicle in 30 minutes or less. 

All stations will be privately owned and operated, with federal funds covering 80% of construction costs and the private developer paying 20%. No state funds will be involved in the construction of these stations, according to ADOT.

While the initial round of electric vehicle charging stations focuses on interstates, ADOT plans to expand onto other highways starting with an additional round of bids in 2025. The plans will evolve based on developments within the electric vehicle industry and by studying the use patterns of the first set of stations that come online, officials said.

For more information about the EV plan and additional ways to provide input, visit AZDOT.gov/EVPlan.