Log in

Keyword: designs

Pursuit Park industrial complex planned in Mesa

2/14/2022
Four industrial buildings totaling 900,000 square feet are to be constructed north of Elliot Road on the west side of Signal Butte Road in Mesa. Preliminary design for the Pursuit Park industrial …

The Learning Experience day care planned in Mesa

2/11/2022
The preliminary design and landscaping for a proposed day care facility on 1.6 acres west of Power Road on the south side of McKellips Road was recently discussed by the Mesa Design Review …

Third Andy’s Frozen Custard planned in Mesa

2/10/2022
An Andy’s Frozen Custard with a drive-thru is to be constructed west of Signal Butte Road on the south side of Southern Avenue in Mesa. Preliminary design for the building on 1.39 acres of …

Z’Tejas planned at Gilbert, Baseline roads in Mesa

2/9/2022
A Z’Tejas restaurant and patio area are planned east of Gilbert Road on the north side of Baseline Road in Mesa. Preliminary design for the building on 0.82 acres recently was discussed by …

Jamba, McAlister’s Deli planned in Mesa

1/17/2022
Two restaurants with a drive-thru are planned east of Crismon Road on the south side of Southern Avenue in Mesa. Preliminary design for the building with Jamba and McAlister’s Deli on 1.39 …

1.2M square feet industrial building planned in Mesa

1/15/2022
A 47-foot-tall, 1,200,340-square-feet industrial building is to be constructed south of Pecos Road on the east side of the Crismon Road alignment in Mesa. Preliminary design for the 85.8-acre …

Angie’s Lobster planned on Signal Butte Road in Mesa

1/13/2022
An Angie’s Lobster is to be constructed south of Guadalupe Road on the west side of Signal Butte Road in Mesa. The restaurant has locations in Tempe and Glendale. The Mesa site is to open in …

The Annex at Cadence planned in Mesa

12/27/2021
A development with three-, four- and five-plex attached single-residence lots is planned east of Ellsworth Road on the south side of Cadence Parkway in Mesa. Preliminary design for the 6.96-acre …

Commercial center to be added to Cannon Beach in Mesa

12/24/2021
The preliminary design for Phase 2 of the 40-acre Cannon Beach mixed-use commercial center at the southeast corner of Power and Warner roads recently was discussed by the Mesa Design Review …

Dutch Bros planned at Power, Ray in Mesa

12/22/2021
A Dutch Bros coffee shop with a drive-thru is planned south of Ray Road on the east side of Power Road in Mesa. The preliminary design for the 0.92-acre development recently was discussed by the …

Countryside Modern apartments planned at Lindsay, …

12/20/2021
Forty units in five two-story apartment buildings are planned east of Lindsay Road on the south side of Southern Avenue in Mesa. The preliminary design for the 2.2-acre Countryside Modern …

Rec center with 21 pickleball courts planned in Mesa

12/18/2021
A large-scale commercial recreation center is to be constructed near Mesa Regal and Tower Point RV resorts east of Greenfield Road on the north side of Main Street in Mesa. The preliminary design …